Day 8 — Major Progress



We all finally got in a full day’s work at the chez. Martha & Dory got close to finishing the painting of the living room ceiling.

Lynda continued to work on removing the wallpaper in the bedrooms — those results are so good that we’ve decided save money & simplify logistics by painting those walls, rather than wallpapering them.

And I was able to demolish most of the arches in the kitchen. We love the open feel and hope to enclose the front entrance in a glass facade so that we can leave the front door open and see the great stone wall and rose bushes (including spot lighting them at night). Tomorrow I’ll post before and after pictures of the kitchen, after the final bit of the columns & arches are down.
– Rick
This entry was posted in Chez Mirabel. Bookmark the permalink.