Progress Update
We made big progress today! Dory and Martha cleaned the tiles in the master and middle bedrooms after Rick finished laying the grout. They look beautiful. Rick then demolished the old kitchen sink cabinet and prepared the walls and floors … Continue reading
Posted in Chez Mirabel
Comments Off on Progress Update
Martha “hangs out” in Mirabel
Martha, never to shirk a challenge, manages to paint the living room window casing by standing on the windowsill on the second story of our house on the Rue de Charles de Gaulle. She received a thumbs up sign for … Continue reading
Posted in Chez Mirabel
Comments Off on Martha “hangs out” in Mirabel
Remodeling Progress Report
Our floor tiles are terracotta (the large one here). The others we are thinking of using in the upstairs bathroom. Rick finished installing the coving on the floor of the master bedroom today – hurray! We brought home some Italian … Continue reading
Posted in Chez Mirabel
Comments Off on Remodeling Progress Report
To Steve and Jim
Each night at dinner we toast our missing partners, Steve and Jim. We wish you both were here! Tonight’s dinner is in honor of Alice, our dear friend, who is leaving tomorrow to return to her home in San Miguel … Continue reading
Posted in Chez Mirabel
Comments Off on To Steve and Jim
The Summer Kitchen
Today, while Rick finished tiling two more bedrooms, Alice and I tore into the old “cuisine d’été” on the 3rd floor — tearing down old cabinets, shelves and tiles. Martha, Lynda, Alice and I have been painting walls and ceilings … Continue reading
Posted in Chez Mirabel
Comments Off on The Summer Kitchen
Quite an exciting day today with three different kitchen adventures. Cuisine #1: we began the day in Avignon where we finalized the design for our own new kitchen at Chez Mirabel. We put the finishing touches onto our digital design, … Continue reading
November 19, 2011
Comments Off on Day 18 — Les Trois Cuisines
Day 16 — Bathroom Demolition
Martha tackled the upstairs bath today, removing all the wall tile. Before & after shots below (unfortunately I didn’t get a picture of her standing in ankle-deep debris): Unfortunately the before shot doesn’t capture the tub area’s very low … Continue reading